Inspection Detail
Inspection: 1531266.015 - Bp Surface Solutions, Llc
Inspection Information - Office: Lubbock Area Office
Site Address:
Bp Surface Solutions, Llc
Sugg-A 184 Tb
Big Lake, TX 76932
Mailing Address:
4705 South Chadbourne St, San Angelo, TX 76904
Union Status: NonUnion
SIC:
NAICS: 213112/Support Activities for Oil and Gas Operations
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/17/2021
Emphasis: P:Oilgas, L:Oilgas
Case Closed: 12/07/2022
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 1767811 | Yes | |
| Inspection | 1531254 | Yes | |
| Inspection | 1531278 | Yes | |
| Inspection | 1531273 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 1 | 3 | |||
| Current Violations | 1 | 1 | 2 | |||
| Initial Penalty | $16,384 | $0 | $0 | $767 | $0 | $17,151 |
| Current Penalty | $6,827 | $0 | $0 | $767 | $0 | $7,594 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 5A0001 | 09/17/2021 | 10/18/2021 | $0 | $9,557 | $0 | 10/18/2021 | F - Formal Settlement | Citation has been deleted. |
| 2. | 01002 | Serious | 19100147 F03 II D | 09/17/2021 | 10/18/2021 | $6,827 | $6,827 | $0 | 10/18/2021 | F - Formal Settlement | |
| 3. | 02001A | Other | 19100147 C05 II D | 09/17/2021 | 10/18/2021 | $767 | $767 | $0 | 10/18/2021 | F - Formal Settlement | |
| 4. | 02001B | Other | 19100147 C05 III | 09/17/2021 | 10/18/2021 | $0 | $0 | $0 | 10/18/2021 | F - Formal Settlement | Citation has been deleted. |
Investigation Summary
At 1:00 p.m. on May 13, 2021, three employees were working for a construction group that was contracted as a roustabout crew to conduct the cleaning of the tank and replace the fire tubes inside a tank. Five coworkers from a company that provides support services for oil and gas companies were also hired to assist and clean the tank after the fire tubes were removed. Another coworker from the same company as the coworkers was contracted to operate the vacuum truck and suck the sludge out of the tank. Still another contractor was hired to operate a hot oil truck to provide water to the roustabout crew for cleaning. The coworkers had completed pulling out the old fire tubes and had begun the process of cleaning the inside of the tank when an explosion occurred. All three employees were hospitalized to treat 2nd and 3rd degree burns to their upper body including their face and arms.
Keywords: Arm, Back, Blunt force, Blunt force trauma, Burn, Chest, Cleaning, Explosion, Face, Fire, Flammable Liquid, Flammable Vapors, Heater, High Temperature, Lack of Work Procedures, Multi-employer Worksite, Multiemployer, Oil And Gas Support Services, PPE, PPE Hazard Assessment, Protective Clothing, Replace, Replacing, Skin, Struck By, Tank, Torso, Water Heater
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1531266.015 | 18 | M | Hospitalized injury | Occupation Not Listed | |
| 2 | 1531266.015 | 18 | M | Hospitalized injury | Occupation Not Listed | |
| 3 | 1531266.015 | 18 | M | Hospitalized injury | Occupation Not Listed |