Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1542164.015
Citation: 02036
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,461.00
Current Penalty: $3,000.00
Issuance Date: 01/06/2022
Nr Instances: 11
Nr Exposed: 15
Abatement Date: 09/30/2022
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 02/11/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | 09/27/2022 | $3,000.00 | 09/30/2022 | Serious | |
| Penalty | P: Petition to Mod Abatement | 07/05/2022 | $3,000.00 | 09/30/2022 | Serious | |
| Penalty | I: Informal Settlement | 02/11/2022 | $3,000.00 | 02/24/2022 | Serious | |
| Penalty | Z: Issued | 01/06/2022 | $5,461.00 | 02/24/2022 | Serious |
Text For Citation: 02 Item/Group: 036 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose. Each outlet box in completed installations did not have a cover, faceplate or fixture canopy: A. Water Recirculating Unit: On, or about, August 6, 2021, a cover was missing on the General Electric transformer located under the ITE disconnect labelled "pump". B. Plastics Finishing: On, or about, August 27, 2021, a cover was missing on the junction box mounted on the side of the Chromalox boiler. C. Plastic Molding, Machine #331, Reed: On, or about, August 27, 2021, a cover was missing on the hydraulic interlock switch junction box. D. Plastic Molding, White HPM: On, or about, August 27, 2021, covers were missing for the barrel position cam switches and on a valve. E. Plastic Molding: On, or about, August 27, 2021, a wall mounted junction box that was located above the opening that communicated with the Old Pill Room was not provided with a cover. F. Injection Molding Department, Machine #207, Reed Injection Molding Machine: On, or about, September 2, 2021, a cover was not provided on green junction box for press wiring and the back of the control box for the machine. G. Injection Molding Department, Machine 216, a HPM Injection Molding Machine: On, or about, September 2, 2021, a cover was not provided on a pressure switch used for lubricants. H. Injection Molding Department, Machine #265, a HPM Horizontal Injection molding machine: On, or about, September 2, 2021, a cover was not provided on the back of the control box and on a solenoid valve. I. Tool Room: On, or about, September 2, 2021, an elbow fitting provided on the back of Machine #0174, a REM horizontal lathe, was not provided with a cover. J. Shipping and Receiving: On, or about, September 20, 2021, a cover was not provided on the quad receptacle box that was used to energize the shrink wrap machine. K. Power Metal Compacting: On, or about, October 6, 2021, a cover was not provided on a junction box located on the right side of Press #39, an Alpha hydraulic compacting press.