Violation Detail
Standard Cited: 19100119 M05 Process safety management of highly hazardous chemicals.
Inspection Nr: 315298307
Citation: 01021B
Citation Type: Serious
Abatement Status: X
Initial Penalty: $7,000.00
Current Penalty:
Issuance Date: 09/12/2011
Nr Instances: 2
Nr Exposed: 12
Abatement Date: 04/19/2012
Gravity: 10
Report ID: 0134000
Contest Date: 09/30/2011
Final Order: 05/01/2012
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 05/01/2012 | 04/19/2012 | Serious | ||
| Penalty | Z: Issued | 09/12/2011 | $7,000.00 | 10/27/2011 | Serious |
Text For Citation: 01 Item/Group: 021B Hazard: CHEMNEP
29 CFR 1910.119(m)(5): The employer did not establish a system to promptly address and resolve the incident investigation report findings and recommendations: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, recommendations made to resolve findings resulting from an incident investigation conducted on 10/24/2008, which involved a vapor release due to clogged vent lines, had not been resolved. (b) Location - Polyurethane: On or about the time of the Inspection, recommendations made to resolve findings resulting from an incident investigation conducted on 09/13/2010, which involved over pressurization of a vessel due to a plugged flame arrestor, had not been resolved.