Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1401131.015
Citation: 01010
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,472.00
Current Penalty: $5,683.20
Issuance Date: 11/13/2019
Nr Instances: 1
Nr Exposed: 18
Abatement Date: 12/18/2019
Gravity: 5
Report ID: 0215800
Contest Date: 11/21/2019
Final Order: 10/14/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/14/2021 | $5,683.20 | 12/18/2019 | Serious | |
| Penalty | C: Contested | 11/22/2019 | $9,472.00 | 12/18/2019 | Serious | |
| Penalty | Z: Issued | 11/13/2019 | $9,472.00 | 12/18/2019 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed. a) Frazer & Jones Company, on or about 8/12/19 and 9/16/19: The employer had not conducted a periodic or more frequent inspection of their energy control procedures to ensure that the procedures and the requirements of this standard were being followed. Equipment energy control procedures requiring inspection include but are not limited to: Lindberg Annealing Furnace, Greenard Presses, Core Machines, Cleveland Auto Tap Machine and Denison Presses.