Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1766309.015
Citation: 01006
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 01/27/2025
Nr Instances: 1
Nr Exposed: 11
Abatement Date: 02/19/2025
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 02/27/2025
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/27/2025 | $16,550.00 | 02/19/2025 | Other | |
| Penalty | Z: Issued | 01/27/2025 | $16,550.00 | 02/19/2025 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) Assembly Department- On or about August 01, 2024, the employer did not ensure energy control procedures were developed for vacuuming the unit using oil and nitrogen to prevent the unexpected filling of the transformer.