Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1359641.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,273.00
Current Penalty: $1,590.00
Issuance Date: 01/24/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/20/2019
Gravity: 1
Report ID: 0521700
Contest Date:
Final Order: 02/19/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/19/2019 | $1,590.00 | 02/20/2019 | Serious | |
| Penalty | Z: Issued | 01/24/2019 | $2,273.00 | 02/20/2019 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations. a. On or about November 10, 2018, at the above addressed jobsite, an engineering survey was not performed by a competent person prior to the start of demolition activities.
Translate