Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1747584.015
Citation: 01005B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,292.00
Current Penalty: $0.00
Issuance Date: 11/06/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 01/15/2025
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 12/03/2024
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/03/2024 | $0.00 | 01/15/2025 | Serious | |
| Penalty | Z: Issued | 11/06/2024 | $11,292.00 | 11/26/2024 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees. On or about May 12, 2024 and at times prior thereto, on the Crazy Dance ride at Adair park in Stilwell Oklahoma, employees were disassembling the Crazy Dance ride for transport without controlling all sources of energy by affixing locks or tags to the energy control devices.
Translate