Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1759247.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $6,452.00
Current Penalty: $7,500.00
Issuance Date: 12/13/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0214700
Contest Date: 12/30/2024
Final Order: 03/07/2025
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 03/07/2025 | $7,500.00 | Serious | ||
| Penalty | C: Contested | 12/30/2024 | $6,452.00 | Serious | ||
| Penalty | Z: Issued | 12/13/2024 | $6,452.00 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.850(a):Evidence in writing was not available that an engineering survey performed by a competent person had been performed prior to permitting employee(s) to start demolition operations: a) Worksite: 56 Kirkwood Road, Port Washington, NY - An engineering survey was not conducted by a competent person prior to starting demolition operations; on or about July 1, 2024. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.