Violation Detail
Standard Cited: 19100269 M03 VII Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1640791.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $15,625.00
Current Penalty: $15,625.00
Issuance Date: 04/18/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/26/2024
Gravity: 10
Report ID: 0522000
Contest Date: 05/04/2023
Final Order: 01/25/2024
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/25/2024 | $15,625.00 | 02/26/2024 | Serious | |
| Penalty | C: Contested | 05/08/2023 | $15,625.00 | 05/05/2023 | Serious | |
| Penalty | Z: Issued | 04/18/2023 | $15,625.00 | 05/05/2023 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.269(m)(3)(vii): (Deenergizing lines and equipment): The employer shall ensure the installation of protective grounds as required by paragraph (n) of this section. (a) On Dec. 23, 2022, employees were exposed to electric shock while repairing a downed overhead powerline in that the employer did not ensure protective ground jumpers were installed on the primary conductor and neutral prior to employees making line repairs.