Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 917602.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,690.00
Issuance Date: 12/09/2013
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/23/2014
Gravity: 10
Report ID: 0627500
Contest Date: 01/03/2014
Final Order: 06/11/2014
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/11/2014 | $4,690.00 | 06/23/2014 | Serious | |
| Penalty | C: Contested | 01/07/2014 | $7,000.00 | 12/19/2013 | Serious | |
| Penalty | Z: Issued | 12/09/2013 | $7,000.00 | 12/19/2013 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into pysical or electrical contact with the electric power circuit: On or about July 9, 2013, mechanical room #1 at the El Paso Airport, the employer did not ensure that employees did not make physical or electrical contact with energized electrical circuits during the retrofitting of fluorescent luminaires, exposing employees to electrical hazards.