Violation Detail
Standard Cited: 19100269 D06 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1695721.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/12/2024
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 04/18/2024
Gravity: 10
Report ID: 0420100
Contest Date:
Final Order: 03/18/2024
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/18/2024 | $0.00 | 04/18/2024 | Serious | |
| Penalty | Z: Issued | 02/12/2024 | $0.00 | 03/08/2024 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(d)(6)(ii): The machine or equipment was not turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown was not used to avoid any additional or increased hazards to employees as a result of the equipment stoppage: a) On or about September 1, 2023 at the Lagoon Creek Combustion Turbine employees performing fuel gas supply energy isolation utilized procedures that did not avoid any additional or increased hazards to employees as a result of the equipment stoppage in that ignition sources were not eliminated or controlled and struck-by hazards were created through the venting of high pressure natural gas without decreasing the pressure as much as possible prior to opening of the vent pipes.
Translate