Violation Detail
Standard Cited: 19100269 L01 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1539931.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,288.00
Current Penalty: $7,372.80
Issuance Date: 10/26/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/22/2021
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 12/15/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/15/2021 | $7,372.80 | 11/22/2021 | Serious | |
| Penalty | Z: Issued | 10/26/2021 | $12,288.00 | 11/22/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(l)(1)(iii): Electric lines and equipment were not considered and treated as energized unless they had been de-energized in accordance with paragraph (d) or (m) of this section: (a) On or about June 29, 2021, two employees installing electrical equipment were exposed to an electrical hazard when the equipment was not treated as energized.