Violation Detail
Standard Cited: 19260251 B03 Rigging equipment for material handling.
Inspection Nr: 1119633.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,900.00
Current Penalty: $4,500.00
Issuance Date: 07/19/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/29/2016
Gravity: 10
Report ID: 0418600
Contest Date:
Final Order: 08/04/2016
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/04/2016 | $4,500.00 | 07/29/2016 | Serious | |
| Penalty | Z: Issued | 07/19/2016 | $4,900.00 | 07/29/2016 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.251(b)(3): Job or shop hooks and links, or makeshift fasteners, formed from bolts, rods, etc. or other such attachments were used: a) At Wetumpka Airport, Wetumpka, Alabama: On or about January 20, 2016 and at times prior; the employer allowed his employees to use an alloy steel sling which had previously been repaired with parts such as but not limited to an eye nut which was being used as a master link to connect the two legs of the sling which are not prescribed in alloy chain slings.
Translate