Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 106602667
Citation: 01003
Citation Type: Serious
Abatement Status: X
Initial Penalty: $560.00
Current Penalty: $335.00
Issuance Date: 08/20/1990
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/19/1990
Gravity: 07
Report ID: 0636900
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/05/1990 | $335.00 | 10/19/1990 | Serious | |
| Penalty | Z: Issued | 08/20/1990 | $560.00 | 08/30/1990 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard: EXPLOSION
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a) Fire, well blowout, or crane collapse hazards, Rig #11, on or about May 10, 1990. Among other methods, one feasible and acceptable abatement method to correct this hazard would be installation of a properly rigged and secured emergency descent device or other satisfactory auxiliary means of egress, such as specified in section 4.7, paragraph 4.7.1, of A.P.I. RP54, First Edition, January 1981, Page 11. Essential elements of this procedure would include: 1) Staking out a securely anchored one-half (1/2) inch wire rope escape line attached to the derrick, mast or pole so as to provide a ready and convenient means of escape from the derrickman's working platform or rod basket. 2) The escape line route is to be kept clear of obstructions. 3) A safety device is to be provided to permit fast and emergency exit from the derrickman's working platform to a safe place. 4) The tension on the escape line is to be periodically checked and adjusted to assure a safe landing and to allow the derrickman to stop twenty (20) to twenty-five (25) feet from the anchor point. 5) The ground anchor point of the escape line is to be located a minimum lateral distance from the derrick, mast or pole equal to the height above ground to the point where the escape line is fastened to the derrick, mast or pole.