Violation Detail
Standard Cited: 19260417 A Lockout and tagging of circuits.
Inspection Nr: 917602.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/09/2013
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/23/2014
Gravity: 5
Report ID: 0627500
Contest Date: 01/03/2014
Final Order: 06/11/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/11/2014 | $0.00 | 06/23/2014 | Serious | |
| Penalty | C: Contested | 01/07/2014 | $0.00 | 12/19/2013 | Serious | |
| Penalty | Z: Issued | 12/09/2013 | $0.00 | 12/19/2013 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.417(a): Controls that were to be deactivated during the course of work on energized or de-energized equipment or circuits were not tagged: On or about July 9, 2013, mechanical room #1 at the El Paso Airport, controls for the fluorescent luminaire circuit were not deenergized and were not tagged, exposing employees to electrical hazards.
Translate