Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1502795.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/12/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/29/2021
Gravity: 10
Report ID: 0111500
Contest Date:
Final Order: 06/10/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 05/12/2021 | $0.00 | 06/29/2021 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(d)(2): An orderly shutdown of machine or equipment was not utilized to avoid any additional or increased hazards to employees as a result of equipment stoppage: Location: 950 Campbell Avenue, West Haven, CT - On or about November 13, 2020, an orderly sequence to shutting down the steam main in Building #22 was not utilized for ensuring that condensate water could be drained from the system.