Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1757305.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $6,452.00
Current Penalty: $4,200.00
Issuance Date: 11/07/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/04/2024
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 12/06/2024
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/06/2024 | $4,200.00 | 12/04/2024 | Serious | |
| Penalty | Z: Issued | 11/07/2024 | $6,452.00 | 12/04/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
1926.850(a): Evidence in writing was not available that an engineering survey performed by a competent person had been performed prior to permitting employee(s) to start demolition operations: (a) Loading yard - On or about June 25, 2024, the employer did not ensure that an engineering survey had been done before the start of dismantling and the demolition of silos, exposing the employees to struck-by hazards.