Violation Detail
Standard Cited: 19260552 A01 Material hoists, personnel hoists, and elevators.
Inspection Nr: 1734860.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,323.00
Current Penalty: $2,000.00
Issuance Date: 08/20/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 10
Report ID: 0214200
Contest Date:
Final Order: 09/09/2024
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/09/2024 | $2,000.00 | Serious | ||
| Penalty | Z: Issued | 08/20/2024 | $5,323.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.552(a)(1): The employer did not comply with manufacturer's specifications and limitations applicable to the operation of all hoists and elevators: a. 37 Ivy Street, Kearny, NJ - Roof The employer did not ensure the materials hoist used to lift roofing materials was compliant with the manufacturers specific requirement prior to using the equipment. Employees used an RGC, model SH300, Hand Swing Hoist to place materials on the roof and did not secure the hoist base to prevent tipping of the hoist. Violation occurred on or about March 12, 2024.
Translate