Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1467605.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,783.00
Current Penalty: $4,048.10
Issuance Date: 04/17/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/13/2020
Gravity: 1
Report ID: 0729700
Contest Date:
Final Order: 05/01/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/01/2020 | $4,048.10 | 05/13/2020 | Serious | |
| Penalty | Z: Issued | 04/17/2020 | $5,783.00 | 05/13/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that the periodic inspections have been performed: Employees engaged in servicing, maintenance, setup, clearing jam, and troubleshoot activities throughout the machine shop area at the following equipment but not limited to the W/C 186D Niigata SPN 50 H.O CNC machine, the W/C 188C Niigata SPN 50 CNC machine, the Makino Mag 3 EX machine, the Makino Mag 3 W machine, and the Powermill H18 Series machine which had multiple energy sources including pneumatic, electric, hydraulic, and gravity were exposed to electrical, struck-by and caught-between hazards in that periodic inspections of the energy control procedures for equipment were not performed. 29 CFR 1903.19(c)(1) requires certification that the abatement of the above violation is complete.
Translate