Violation Detail
Standard Cited: 19260451 F07 General requirements.
Inspection Nr: 1561383.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/01/2022
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 05/27/2022
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 04/29/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/29/2022 | $0.00 | 05/27/2022 | Serious | |
| Penalty | Z: Issued | 04/01/2022 | $0.00 | 04/27/2022 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a) At the Hyde Park Project - 2103 Bayshore Blvd, Tampa, FL: On or about November 1, 2021, employees were exposed to struck-by injures and possible scaffold collapse from not having trained employees assembling the scaffold.
Translate