Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1535309.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/21/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/18/2021
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 10/18/2021
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 09/21/2021 | $0.00 | 10/18/2021 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.451(f)(3):Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a) Indoor pool area: On or about May 21, 2021, an employee worked from a scaffold to scrape paint from the ceiling in preparation for repainting. The scaffold was not inspected for visible defects prior to beginning work in that bolts and/or wingnuts were missing from guard rail sections.
Translate