Violation Detail
Standard Cited: 19100179 N03 III B Overhead and gantry cranes.
Inspection Nr: 1438531.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/13/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/07/2020
Gravity: 5
Report ID: 0336000
Contest Date:
Final Order: 05/06/2020
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/06/2020 | $0.00 | 05/07/2020 | Serious | |
| Penalty | Z: Issued | 04/13/2020 | $0.00 | 05/07/2020 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.179(n)(3)(iii)(b): During hoisting, the load contacted obstructions: A.) Erie Strayer Company, 1851 Rudolph Avenue, Erie, PA 16502, Pre-Fabrication Department (Department 50), I-beam drop staging area, west end of the building, on or about October 15, 2019 and times prior there to: An employee sustained a left tibia/fibula fracture when an I-beam that was being hoisted came into contact with the conveyor, kicked-out, and impacted a stack of I-beams that were stacked flange-on-flange, three tiers high. The I-beam from the stack fell onto the employee's left leg. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.