Violation Detail
Standard Cited: 19261410 D01
Inspection Nr: 1344003.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/04/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/12/2019
Gravity: 10
Report ID: 0418800
Contest Date:
Final Order: 03/22/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/22/2019 | $0.00 | 04/12/2019 | Serious | |
| Penalty | Z: Issued | 03/04/2019 | $0.00 | 03/21/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.1410(d)(1): The employer did not hold a planning meeting with the utility owner/operator (or registered professional engineer who is a qualified person with respect to electrical power transmission and distribution) to ensure that a power line equipped with a device that automatically reenergizes the circuit in the event of a power line contact, before the work begins, the automatic reclosing feature of the circuit interrupting device must be made inoperative if the design of the device permits: On or about September 4, 2018, on the west side of a worksite located at 1199 W. Lantana Road in Lake Worth, Florida, employees were exposed to electrocution hazards when permitted to performing concrete wall panel installation using a wheel mounted crane located within 7 feet or less of overhead power lines energized with 7,620 volts prior to holding a planning meeting with the utility owner/operator to ensure that a power line equipped with a device that automatically reenergizes the circuit in the event of a power line contact was made inoperative.