Violation Detail
Standard Cited: 19260251 A01 Rigging equipment for material handling.
Inspection Nr: 1330085.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/13/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/10/2018
Gravity: 10
Report ID: 1032500
Contest Date:
Final Order: 10/02/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/02/2018 | $0.00 | 10/10/2018 | Serious | |
| Penalty | Z: Issued | 09/13/2018 | $0.00 | 10/10/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.251(a)(1): Rigging equipment for material handling was not inspected prior to use on each shift and as necessary during its use to ensure that it was safe: (a) Amalgamated Sugar: On or about June 28, 2018 and at times prior, an employer did not ensure the rigging was properly connected while removing secondary supports in the White Sugar Mixer. Note: Abatement certification and documentation is required for this item.
Translate