Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1625428.015
Citation: 01001A
Citation Type: Other
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $15,625.00
Current Penalty: $10,000.00
Issuance Date: 03/24/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/10/2023
Gravity: 10
Report ID: 0317500
Contest Date: 04/14/2023
Final Order: 12/11/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/11/2023 | $10,000.00 | 05/10/2023 | Other | |
| Penalty | C: Contested | 04/14/2023 | $15,625.00 | 05/10/2023 | Serious | |
| Penalty | Z: Issued | 03/24/2023 | $15,625.00 | 05/10/2023 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.850(a):An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations. (a) Hatfield Power Plant, 2773 East Ray Furman Highway, Carmichaels, PA 15320, Precipitation Area on or about September 28th, 2022 at approximately 8:15AM employees were not protected from unplanned sudden collapse of duct work while in the process of dismantling. No engineering survey was completed on the duct work.