Violation Detail
Standard Cited: 19100110 B17 I Storage and handling of liquefied petroleum gases.
Inspection Nr: 1579635.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,167.00
Current Penalty: $5,584.00
Issuance Date: 08/05/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/24/2022
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 08/25/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/25/2022 | $5,584.00 | 10/24/2022 | Serious | |
| Penalty | Z: Issued | 08/05/2022 | $11,167.00 | 08/23/2022 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.110(b)(17)(i):Electrical equipment and wiring was not installed in accordance with subpart S of this part: a) International Cushioning Co. on or about February 22, 2022, at the address of 2101 Cedar St. Fremont, OH: The employer did not ensure electrical equipment utilized in proximity of the foam line, to include but not limited to industrial fans, were rated for the hazardous atmosphere in which they were operated in. In this condition, employees were exposed to burns and fire hazards.
Translate