Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1561383.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,801.00
Current Penalty: $3,190.55
Issuance Date: 04/01/2022
Nr Instances: 1
Nr Exposed: 20
Abatement Date:
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 04/29/2022
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/29/2022 | $3,190.55 | Serious | ||
| Penalty | Z: Issued | 04/01/2022 | $5,801.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(f)(3):Scaffold and scaffold components were not inspected for visible defects by a competent person before each workshift and after any occurrence which could affect a scaffold's structural integrity: a) At the Hyde Park Project - 2103 Bayshore Blvd, Tampa, FL: On or about November 1, 2021, employees were exposed to struck-by injures and possible scaffold collapse from not inspecting scaffold components before distributing them for assembly and assembling them.
Translate