Violation Detail
Standard Cited: 19260752 D Site layout, site-specific erection plan and construction sequence.
Inspection Nr: 1410403.015
Citation: 01001A
Citation Type: Serious
Abatement Status:
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 12/20/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 01/17/2020
Gravity: 10
Report ID: 0418400
Contest Date: 02/11/2020
Final Order:
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 02/19/2020 | $13,260.00 | 01/17/2020 | Serious | |
| Penalty | Z: Issued | 12/20/2019 | $13,260.00 | 01/17/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.752(d): All hoisting operations in steel erection were not pre-planned to ensure that the requirements of 29 CFR 1926.753(d) were met: A) Hotel lobby area, on or about June 23, 2019, and or times prior to, the employer did not adequately preplan the lift of a grappler by a winch. The thickness and strength of the east and west side girders where the padeyes were attached was not determined before attaching the padeyes or making the lift, exposing employees to a struck by hazard.