Violation Detail
Standard Cited: 19100147 C04 II A The control of hazardous energy (lockout/tagout).
Inspection Nr: 1365269.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,525.00
Current Penalty: $5,711.75
Issuance Date: 02/15/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/12/2019
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 03/07/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/07/2019 | $5,711.75 | 03/12/2019 | Serious | |
| Penalty | Z: Issued | 02/15/2019 | $8,525.00 | 03/12/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii)(A): The energy control procedures did not contain a specific statement on the intended use of the procedure. On or about December 3, 2018, Employees were exposed to unexpected start-up or release of stored energy while performing servicing and maintenance activities on the Gasket Machine, and the employer did not include a specific statement on the intent use of the procedures.
Translate