Standard Cited: 19100269 M03 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1281473.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,054.00
Current Penalty: $9,054.00
Issuance Date: 03/16/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/11/2018
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order: 04/10/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/10/2018 | $9,054.00 | 04/11/2018 | Serious | |
| Penalty | Z: Issued | 03/16/2018 | $9,054.00 | 04/11/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.269(m)(3)(ii): The employer did not ensure that all switches, disconnectors, jumpers, taps, and other means through which known sources of electric energy may be supplied to the particular lines and equipment to be denenergized were open. The employer did not render such means inoperable, unless its design does not so permit, and then sure that such means are tagged to indicate that employees are at work: On 12/1/2017, three employees were changing out "A" phase regulator and did not ensure the bypass, source, and load switches had been positioned to de-energize it. A ground connection was removed while the regulator was energized and an employee received a serious electric shock.