Violation Detail
Standard Cited: 19100269 D02 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1749736.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $4,839.00
Current Penalty: $4,839.00
Issuance Date: 09/26/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/25/2024
Gravity: 10
Report ID: 0627510
Contest Date: 10/30/2024
Final Order:
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 11/06/2024 | $4,839.00 | 10/25/2024 | Serious | |
| Penalty | Z: Issued | 09/26/2024 | $4,839.00 | 10/25/2024 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(d)(2)(i): The employer did not establish a program consisting of energy control procedures, employee training, and periodic inspections to ensure that, before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up, or release of stored energy could occur and cause injury, the machine or equipment is isolated from the energy source and rendered inoperative. On or about May 20, 2024, employees were working on pole 10CR2 connected to high voltage lines without the employer developing and implementing Lockout/Tagout procedures.