Violation Detail
Standard Cited: 19100269 D06 VII Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1500131.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $8,173.00
Issuance Date: 04/21/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/17/2021
Gravity: 5
Report ID: 0418200
Contest Date: 06/14/2021
Final Order: 04/13/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 04/13/2022 | $8,173.00 | 05/17/2021 | Other | |
| Penalty | C: Contested | 07/20/2021 | $13,653.00 | 05/17/2021 | Serious | |
| Penalty | Z: Issued | 04/21/2021 | $13,653.00 | 05/17/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(d)(6)(vii):Before starting work on machines or equipment that had been locked out or tagged out, the authorized employee did not verify that isolation and deenergizing of the machine or equipment had been accomplished. a) Lake Oliver Dam: On or about 10/27/2020, and at times prior, the employer exposed employees to caught-in hazards, in that the isolated condition of lock out devices were not verified prior to diving operations.