Violation Detail
Standard Cited: 19100269 A02 I A Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1486468.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,494.00
Current Penalty: $8,771.10
Issuance Date: 10/09/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/31/2020
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 11/05/2020
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/05/2020 | $8,771.10 | 12/31/2020 | Serious | |
| Penalty | Z: Issued | 10/09/2020 | $13,494.00 | 11/16/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(a)(2)(i)(A): Each employee shall be trained in, and familiar with, the safety-related work practices, safety procedures, and other safety requirements in this section that pertain to his or her job assignments. a. On or about August 3, 2020, the employer did not ensure that employees performing troubleshooting and repair work on a 4,000 volt breaker followed established practices for the control of arc flash hazards