Violation Detail
Standard Cited: 19260300 A General requirements.
Inspection Nr: 1445940.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $9,282.00
Issuance Date: 01/15/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/11/2020
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 02/19/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/19/2020 | $9,282.00 | 02/11/2020 | Serious | |
| Penalty | Z: Issued | 01/15/2020 | $13,260.00 | 02/11/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.300(a): All hand and power tools and similar equipment, whether furnished by the employer or employee, were not maintained in a safe condition: Washington County Substation - On or about November 13, 2019, an employee suffered an amputation while operating a DeWalt Spline Rotary Hammer with a broken side handle.
Translate