Violation Detail
Standard Cited: 19100333 B02 Selection and use of work practices
Inspection Nr: 1297115.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,391.00
Current Penalty: $7,391.00
Issuance Date: 06/13/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/10/2018
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 07/11/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/11/2018 | $7,391.00 | 07/10/2018 | Serious | |
| Penalty | Z: Issued | 06/13/2018 | $7,391.00 | 07/10/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.333(b)(2): "Lockout and Tagging." While any employee is exposed to contact with parts of fixed electric equipment or circuits which have been deenergized, the circuits energizing the parts shall be locked out or tagged or both in accordance with the requirements of this paragraph. The requirements shall be followed in the order in which they are presented (i.e., paragraph (b)(2)(i) first, then paragraph (b)(2)(ii), etc.). a) Steam Generator Room: On or about February 6, 2018, and at times prior, the employer exposed employees to electrical shock hazards in that no specific procedures to control hazardous electrical energy were developed for conducting electrical maintenance on the Water Steam Generator (Model NB-55562 Serial Number 94249).